A
PE Terminal (Grid Ground)
N Terminal
B
C
L2 Terminal
Figure 35: Wiring box AC assembly – terminal labeling
NOTICE!
AVIS!
WARNING!
AVERTISSEMENT!
1.
Mount the AC disconnect (if required by local AHJ) close enough to the inverter.
2.
Install conduit fitting and conduit into the wiring box compartment from AC disconnect or
utility service panel.
3.
Thread the inverter's AC output wires through cup piece of conduit and loosely fit the
conduit into the inverter's open conduit fitting and the DC disconnect or junction box conduit
fitting.
4.
Route AC wiring through conduit and verify that the exposed wires are at least 6 inches
in length to provide adequate strain relief and wire end strip length required. Secure the
conduit into both fittings then tighten conduit fittings to manufacturer's recommended
torque.
38
L1 Terminal
D
GET (Grounding Electrode Terminal)
E
Stranded copper wire should be checked so that all strands go into
the terminal opening.
AC disconnect may be required by your local AHJ. Please check
local regulations to determine if the AC disconnect is required for
your installation.
A
B
C D
E
AC-side
Terminals