Installation and Operation Manual (Rev A)
SGI 500XT
2.2
Inverter Positioning
The correct mounting position for the inverter is vertical with the mounting feet on the floor.
Figure 2.2.1 shows the basic inverter footprint dimensions:
Figure 2.2.1 – SGI 500XT Dimensions (Top View)
For more detailed drawings and dimensions, please refer to
Customer Interface Drawing, SGI
500XT (DOCR-070160). Drawings are available in .pdf and .dwg formats.
2.3
DC and AC Wire Entry Locations
AC and DC wiring must enter through the provided conduit cutouts in the bottom of the
inverter enclosure or through the alternate conduit entries as detailed in Figure 2.3.1. All DC
termination locations are located in the left side of the inverter enclosure. All AC termination
locations are located in the right side of the inverter enclosure
DOCR- 070254-A
Page 5 of 88