5.4

Inverter turn-off procedure

1. Turn off the AC disconnect (put in open position).
2. Turn off the dedicated 2-pole 240 Vac / 208 Vac circuit breaker in the building
electrical service panel (put in open position).
3. Turn off the DC disconnect (put in open position).
5.5

Standard initial commissioning

5.5.1

Brief overview of the commissioning steps

– Select the grid
– Set up the RS485 communication
5.5.2

Detailed description of the commissioning steps

1.
Check all connections and cables for damage and correct seating. Correct the installation if
necessary.
2.
Switch on the DC disconnect
→ The startup process of the inverter begins.
After the startup process and the automatic self-test, the initial commissioning procedure of
the inverter starts and the Installation menu is displayed.
3.
Select a grid.
G r i d S e l e c t i o n
- - - - - - - - - - - - - - - - - - -
G r i d :
C o n t i n u e
Grids available for standard commissioning
Display text
US 208 D
US 208 WYE
US 240 D
US 240 STING
US 240 SPLIT
U S 2 0 8 D
Description
US 208 DELTA
US 208V/120V WYE
US 240 DELTA
US 240/120 STING
US 240/120 SPLIT