Install Gas Piping - FULTON Caliber Installation And Operation Manual

High efficiency hydronic boilers 300,000 - 850,000 btu/hr
Table of Contents

Advertisement

SECTION 2
CAL-IOM-2012-1220
pressure-reducing ( ll) valve set pressure (minimum 12
psig). No more water should be entering the system.
Close the shuto valve on the cold-water ll line.
14. Visually inspect all pipe joints and equipment
connections for leaks. If necessary, drain system, repair
leaks and re ll/purge the system. If no pressure drop is
detected for a period of two hours under pressure, the
system may be considered watertight.
15. When purging is completed, make sure the following
are open—combination shut-o /purge valve, shuto
valve to pressure reducing ( ll valve), shuto valve in
cold water ll line, and shuto valve in return line.
16. Make sure the following are closed--all drain cocks, the
vent on the combination shuto purge valve, and all
manual vents. Reset zone valves to normal mode of
operation and turn o power to boiler.
17. Open fuel shuto valve, allowing fuel to ow to boiler.

Install Gas Piping

The Caliber boiler is factory test red and combustion is
adjusted per the boiler data plate and test re sheet.
The gas train (Figure 5) components are UL-795 certi ed to
operate at speci c gas pressure requirements. If available gas
pressure is greater than 14" W.C., a lock up style gas pressure
regulator must be provided to reduce the provided pressure
to the acceptable range of 3.5" W.C. to 14" W.C. for natural gas,
and 7" W.C to 14" W.C. for propane.
Adhere to the following for gas piping installation:
1. See Table 4 for required natural gas pipe size, based on
Nominal
ID
Pipe Size
(")
(")
1-1/4
1.380
1-1/2
1.610
2
2.067
2-1/2
2.469
3
3.068
4
4.026
Questions? Call (315) 298-5121, or visit us online at www.fulton.com
TABLE 4 NOMINAL PIPE SIZE
Equivalent Pipe
Max Capacity in ft3 of natural gas per hour. Pressure drop of
Length
0.5"wc/Equivalent length of pipe (feet)
90 Elb
Tee
20
(Feet)
(Feet)
3.45
6.9
950
4.02
8.04
1460
5.17
10.3
2750
6.16
12.3
4350
7.67
15.3
7700
10.1
20.2
15800
overall length of pipe from the meter plus equivalent
length of all ttings. Approximate sizing may be based
on 1,020 BTU for 1 cubic foot of natural gas.
2. Piping must be installed such that no piping stresses
are transmitted to the boiler. The boiler cannot be used
as a pipe anchor.
3. The boiler and all gas piping connections must be
pressure-tested and checked for leaks before being
placed into service. Test with compressed air or inert
gas if possible.
4. The boiler must be disconnected at the boiler manual
shuto valve (located at the end of the supplied gas
train) from the gas supply piping system during any
pressure testing of the system at pressures in excess of
1/2 psig (14 inch W.C.).
5. Gas piping must be installed in accordance with
National Fuel Gas Code, ANSI Z223.1 1991 or latest
addenda and any other local codes, which may apply.
6. The pipe and the ttings used must be new and free of
dirt or other deposits.
7. Piping must be of the proper size to ensure adequate
gas supply. A drip leg and union connection must be
installed upstream of the gas safety shut o valves.
8. Connect gas supply line to the open end of the tee on
which the drip leg is installed.
9. When making gas-piping joints, use a sealing
compound resistant to lique ed petroleum gases. Do
not use Te on tape on gas line threads.
10. After gas piping is completed and before wiring
40
60
80
-----
-----
-----
990
810
-----
1900
1520
1300
3000
2400
2050
5300
4300
3700
10900
8800
7500
INSTALLATION
100
150
200
-----
-----
-----
-----
-----
-----
1150
950
800
1850
1500
1280
3250
2650
2280
6700
5500
4600
2-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Caliber 300Caliber 500Caliber 750Caliber 850