Large Displays
A network switch is required to enable Ethernet communication on one or more cooling units with
large displays. Each cooling unit with a large display requires two straight-through Ethernet cables
from a network switch. One cable connects to port P64 on the Liebert iCOM input/output board and
the other straight-through cable connects to the female-female coupler provided with the unit. Con-
nect the red crossover cable, which is provided with the cooling unit, between the coupler and the P64
port on the back of the large display (see Figure 32).
NOTE
Only cooling units with large displays are supplied with a female-female coupler inside the
unit from the factory.
Figure 29 U2U network setup diagram
Display Service /Network
Liebert iCom Display Menu
IP Address: 192.168.001.001
U2U Address:1
Group #: 1
---------------------------------------
Display Service /Network
Liebert Cooling Unit
Control Board Menu
IP Address: 192.168.001.002
U2U Address: 2
Group #: 1
Liebert Cooling Unit
with Large Liebert
iCOM Display
Installing a Liebert iCOM Unit-to-Unit Network
Display Service /Network
Liebert Cooling Unit
Control Board Menu
IP Address: 192.168.001.003
U2U Address: 3
Group #: 1
Network
Switch
Display Service /Network
Liebert Cooling Unit
Control Board Menu
IP Address: 192.168.001.004
U2U Address: 4
Group #: 1
47
Liebert Cooling Unit
with Small Liebert
iCOM Display
Liebert Cooling Unit
with Small Liebert
iCOM Display
Need help?
Do you have a question about the Liebert Challenger 3000 and is the answer not in the manual?
Questions and answers