Installation; Locating Magnum 6K25 Switches - GarrettCom Magnum 6K25 Hardware Installation And User's Manual

Managed fiber switch
Table of Contents

Advertisement

Magnum 6K25 Managed Fiber Switch
Magnum 8 00E
1
2
3
5
6
7
Workgroup Hub
PWR COL
4
LI NK
8
LI NK
100 Mb /s
RX
RX
GA RRETT
Magnum DS8016 Stackable Hub
X
1
2
3
4
5
6
7
PWR BR
LK/RX
12
13
14
15
16
COL
10
PORT
2 3 4 5
6 7 8 9 10 11 12 13 14 15 16
1
100
COL 100
UPLINK
100Mb Servers
and Workstations
Magnum DS8016 Stackable Hub
X
1
2
3
PWR BR
LK/RX
12
13
14
15
COL
10
PORT
2 3 4 5
6 7 8 9 10 11 12 13 14 15 16
1
100
COL 100
UPLINK
100Mb Servers
and Workstations
3.0

Installation

Before installing the equipment, it is necessary to take the
following precautions:
1.)
If the equipment is mounted in an enclosed or multiple rack
assembly, the environmental temperature around the equipment
must be less than or equal to 50
2.)
If the equipment is mounted in an enclosed or multiple rack
assembly, adequate airflow must be maintained for proper and
safe operation.
3.)
If the equipment is mounted in an enclosed or multiple rack
system, placement of the equipment must not overload or load
unevenly the rack system.
4.)
If the equipment is mounted in an enclosed or multiple rack
assembly, verify the equipment's power requirements to prevent
overloading of the building/s electrical circuits.
5.)
If the equipment is mounted in an enclosed or multiple rack
assembly verify that the equipment has a reliable and
uncompromised earthing path.
6.)
24vdc, -48vdc, and 125vdc must be installed in restricted
access locations.
7.)
CB-Circuit breakers of 10Amps should be shown on top of the
Rack.
This section describes installation of the Magnum 6K25 Switches, as well as
connection of the various Ethernet media types.
3.1

Locating Magnum 6K25 Switches

The location of a Magnum 6K25 Switch is dependent on the physical layout of
the network. Typically the Switch is placed in a central wiring location where groups of
network devices need to be connected in order to communicate with each other. These
www GarrettCom com
.
.
Magnum QS5116
Magnum 6K25
PWR
1
3
5
7
1
Magnum QS5116
10/100
LK
10/100
Fiber Switch
Managed Fiber
ACT
Switch
F/ H
2
4
6
8
F/H
ACT
10/100
LK
F/H
GARRE TT
2
TX
LK
F/H
ACT
8
9
10
11
4
5
6
7
8
9
10
11
16
Magnum DS8016 Stackable Hub
X
1
2
3
4
5
6
7
8
9
10
11
PWR BR
12
13
14
15
16
LK/RX
PORT
2 3 4 5
6 7 8 9 10 11 12 13 14 15 16
COL
10
1
COL 100
100
UPLINK
Magnum 8 00E
Workgroup Hub
PWR COL
100 Mb /s
GA RRETT
100Mb Servers
and Workstations
Installation and User Guide (04/06)
1
3
5
7
3
5
7
10/100
LK
LK
ACT
F/ H
2
4
6
8
ACT
10/100
ACT
LK
F/H
RX
TX
6
LK RX
F/H
ACT
Magnum DS8016 Stackable Hub
X
1
2
3
4
5
PWR BR
LK/RX
12
13
14
15
16
COL
10
PORT
2 3 4 5
6 7 8 9 10 11 12 13 14 15 16
1
100
COL 100
UPLINK
100Mb Servers
and Workstations
Magnum DS8016 Stackable Hub
X
1
2
3
4
5
6
7
8
9
PWR B R
LK/RX
12
13
14
15
16
COL
10
PORT
1
2 3 4 5
6 7 8 9 10 11 12 13 14 15 16
100
COL 100
UPLI NK
1
2
3
5
6
7
4
LI NK
8
LI NK
RX
RX
10Mb Workgroup
0
C.
21
1000Mb Data Mining Servers
Router
100Mbps Full
duplex Fiber for
another Bldg.
6
7
8
9
10
11
10
11
Internet

Advertisement

Table of Contents
loading

Table of Contents