GarrettCom Magnum 6K25 Hardware Installation And User's Manual page 68

Managed fiber switch
Table of Contents

Advertisement

Magnum 6K25 Managed Fiber Switch
C5.1 UL Requirements
The following must be adhered to in order to conform to UL requirements:
1.
Minimum 18 AWG cable for connection to a Centralized DC power source.
2.
Minimum 14 AWG cable for connection to earthing wiring.
3.
Use only with Listed 10 A circuit breaker provided in building installation.
4.
"Complies with FDA radiation performance standards, 21 CFR subchapter J."
or equivalent.
5.
Fastening torque of the lugs on the terminal block: 9 inch pound max.
6.
Centralized DC Power Source cable securement, use at least four cable ties to
secure the cable to the rack at least 4 inches apart with the first one located
within 6 inches of the terminal block.
C6.0
ORDERING INFORMATION
To order the optional Dual-Source -48VDC power supply factory installed,
order "Dual-Src48V" as a separate line item following the product model.
Example: Magnum 6K25R-48VDC
or Dual-Src48V-SWITCH with the ON-OFF manual switch.
Similarly, order the "Dual –source 24VDC" or "Dual-source 125VDC" as a
separate line item following the product model.
Example: Magnum 6K25R-24VDC or Magnum 6K25R-125VDC
C7.0
OPERATION
Operation of the Dual-Source Magnum 6Ks-48VDC, 24VDC and 125VDC
Switch models are identical to that of the standard models.
www GarrettCom com
.
.
Dual-Src-48V for the regular DS model with no ON-OFF switch
Dual-Src24V for regular models with no ON-OFF switch
Or Dual-Src125V-Switch for models with the ON-OFF switch
Installation and User Guide (04/06)
61

Advertisement

Table of Contents
loading

Table of Contents