Connecting The Server To Line Voltage - Fujitsu Primergy N800 Manual

Server system
Table of Contents

Advertisement

Installing the server
RemoteView (RTDS), SEMAN and the CAN bus
The update of the firmware and the testing and diagnosis of the storage
subsystem can only be performed via the CAN bus and using SEMAN (included
on the ServerStart CD) or the optional RemoteView (remote test and
diagnostics system). Refer to the RemoteView manual for more information
(see "Related publications" on page 125).
3.6

Connecting the server to line voltage

The server is equipped with a modular, hot-plug power supply consisting of a
maximum of three power supply units. A redundant power supply can be set up
with a third power supply unit. If a defect occurs in one unit, the other unit
ensures unimpaired further operation. The defective unit can be replaced during
operation.
The power supply units automatically adjust to a voltage range from 100V to
120V or 200V to 240V.
Ê Plug the server's power cord into the insulated socket on the server (see
figure 13 on page 36) and into a free socket on the connector strip on the
rack (see the technical manual for the rack).
U41243-J-Z156-1-76
Connecting the server to line voltage
31

Advertisement

Table of Contents
loading

Table of Contents