Verifying the Installation

Once the Alcatel Wireless LAN Switch is physically installed, run
the following power-on test:
Turn on all installed power supplies in quick succes-
1
sion.
For each power supply, place the power switch in the on (|)
position.
N
—To avoid overloading the first power supplies to be turned
OTE
on while using line cards that provide Power Over Ethernet to
attached devices, all required power supplies should be turned
on at roughly the same time (within about three seconds).
2
Check for the proper power indicators.
Immediately upon power up, you should observe the following:
All power supply AC OK and DC OK LEDs light solid green.
The fan tray Fan Status LED is solid green and you should be
able to feel significant airflow blowing from the chassis vents
at each of the three fan positions.
The line card Power LED is solid green.
The supervisor card Power LED is solid green.
The supervisor card Utilization LEDs begin blinking sequen-
tially from left to right and then right to left.
3
Check for the appropriate operation indicators.
Once the system has successfully booted, you should observe
the following:
The power supply AC OK and DC OK LEDs are still solid green.
3
Verifying the Installation
15