Caution – If necessary, use two people to dismount and carry the chassis.
4. From the front of the server, pull the release tabs forward and pull the server
forward until it is free of the rack rails as shown in the following figure.
A release tab is located on each rail.
FIGURE:
5. Set the server on a sturdy work surface.
66
SPARC Enterprise T5140 and T5240 Servers Service Manual • July 2009
Release Tabs and Slide Assembly