Figure 10 - Modem Pcb Layout - Siemens TC12 Installation, Commissioning And Maintenance Handbook

Installation, commissioning and maintenance handbook
Table of Contents

Advertisement

Off PCB '0'
Level
For switches SW1, SW2, SW3, SW3, SW5, SW6 and SW7 the switch is:
OPEN i.e. '0' WHEN PUSHED DOWN TO THE LEFT, and
CLOSED i.e. '1' WHEN PUSHED DOWN TO THE RIGHT
As a reminder the '0' and '1' positions are shown on the silkscreen below SW1 and
SW7.
For SW4, 4-wire is selected with the switch to the left and 2-wire is selected with the
switch to the right as shown above.
666/HE/43100/000
TC12 Installation, Commissioning & Maintenance Handbook

Figure 10 - Modem PCB Layout

Mode
S1
Select
0 1
Line
S2
Level
Line
S3
Level
2/4 Wire
4 Wire
Selector
S4
Level
Level
Transformer
S5
Select
Line
S6
Level
Line
S7
Level
0 1
Page 30
Variant
2 Wire
Level
On PCB '1'
Level
1 (TOP)
PL1
24 Way to
IMD panel
24
1 (TOP)
PL2
14 Way to
PSU card
14
37
PL3
37 Way 'D'
to MDF or
Transformer
PCB.
1 (TOP)
Issue 10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents