Installing The Power Cord Retaining Clip; Figure 34. Power Cord Retaining Clip; Figure 35. Inserting The Retaining Clip Into The Retaining Bracket - Allied Telesis 48Ts/X Installation Manual

X610 series layer 3 stackable gigabit ethernet switches
Table of Contents

Advertisement

Chapter 3: Installing the Hardware

Installing the Power Cord Retaining Clip

76
This section applies to the fixed power supplies installed in the x610-24Ts,
x610-24Ts/X, x610-48Ts, and x610-48Ts/X switches and to the
AT-PWR250 and AT-PWR800 power supplies.
Perform the following procedure to install the power cord retaining clip on
the switches:
1. Locate the power cord retaining clip, shown in Figure 34.

Figure 34. Power Cord Retaining Clip

2. Install the clip on the AC power connector on the rear panel of the
switch. With the 'u' of the clip facing down, press the sides of the clip
toward the center and insert the short ends into the holes in the
retaining bracket, as shown in Figure 35.

Figure 35. Inserting the Retaining Clip into the Retaining Bracket

You are now ready to install the switches in the equipment rack, as
explained in the next procedure.
1 0 0 - 2
4 0 V A
~
C

Advertisement

Table of Contents
loading

Table of Contents