Figure 53. Installing A Transceiver - Allied Telesis 48Ts/X Installation Manual

X610 series layer 3 stackable gigabit ethernet switches
Table of Contents

Advertisement

2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up if installing in a top slot
and with the label facing down if installing in a bottom slot.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 53.
1 5
1 7
1 9
1 6
1 8
2 0

Figure 53. Installing a Transceiver

5. Repeat this procedure to install additional SFP or SFP+ transceivers or
go to "Cabling the 10/100/1000Base-T and Fiber Optic Ports" on
page 94.
For SFP optical and cabling specifications, consult the documentation
shipped with the module.
x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
2 1 R
2 3 R
2 1
S F P
2 3
2 2 R
2 4 R
2 2
1 0 0 0
/
1 0 0
2 4
R E A D
Y
B U S Y
S D
FA U LT
CL AS
LA SE
S 1
R PR OD
UC T
S T A C
K
M S T R
S T A T
U S
FA U LT
L/ A
1
L/ A
M A S T
E R
2
P R E S
R P S
C O N
P W R
S O L E
2082
93

Advertisement

Table of Contents
loading

Table of Contents