Nortel CALLPILOT Installation And Configuration Manual page 43

Part 2: 703t server hardware installation
Hide thumbs Also See for CALLPILOT:
Table of Contents

Advertisement

November 2005
The following diagram shows how to: 1) align the tabs, 2) engage the cover
and 3) tighten the thumbscrews.
3
What's next?
If you want to install the chassis feet on the bottom of the server, continue
with "Installing the chassis feet" on page 44. Otherwise, continue with the
hardware installation. For more information, see "Installation checklist" on
page 32.
Part 2: 703t Server Hardware Installation
Top and
bottom tabs
on cover
Top and
bottom slots
in chassis
Preinstallation requirements
1
2
G101762
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 703t

Table of Contents