When an export or copy scheduled job is run, it automatically overwrites the cartridge in the tape
drive. If the cartridge is not blank, there is no warning and no record in the job log.
NOTE:
The backup application is not automatically updated with any schedules created on the HP D2D
Backup System. The two are independent of each other. If you want the backup application schedules
to work in conjunction with a schedule on the HP D2D Backup System, you must coordinate them
manually.
To create a scheduled job
1.
Select Scheduled jobs from the Tape Attach section of the navigation bar. A scrollable list of
existing schedules is displayed together with details of the next scheduled tape job.
2.
Click Create.
NOTE:
The Create button is not present if you have already created 50 schedules. You must edit or
delete existing schedules if you want to create new ones.
D2D Backup System HP D2D4112
163
Need help?
Do you have a question about the StorageWorks D2D - Backup Systems and is the answer not in the manual?
Questions and answers