Connect The Control Box To The Main Switch - Duerkopp Adler 511 Installation Instructions Manual

Cnc automat for bartacking seams and short seams
Table of Contents

Advertisement

3.4

Connect the control box to the main switch

2
5
CAUTION !
Only trained personnel or electricians may work on the electric
equipment of the automatic bartacker.
The mains plug must be unplugged!
1
Take off the switching knob.
Loosen the screw 2 in the knob in order to remove.
Remove the cover 3 from the main switch.
Unlock the locking bar in drill-hole 4 with a screwdriver in order to
remove.
Run the cable from the control box into the cable duct.
Insert the cable in the main switch.
Connect the cable wires from the control box to the
screws "T1" and "T2".
Connect the protective-earth conductor of the control box in
the main switch.
Put the cover on the mains switch again.
Put on the switching knob 1 and screw it tight.
Put on the cover of the cable duct.
4
3
2
7

Advertisement

Table of Contents
loading

Table of Contents