Connect The Control Box To The Main Switch - Duerkopp Adler 530 Installation Instructions Manual

Cnc automat for button sewing
Hide thumbs Also See for 530:
Table of Contents

Advertisement

3.4 Connect the control box to the main switch

2
5
ATTENTION !
Any kind of work on the electric equipment of the button sewing
automat must be carried out only by electricians or trained personnel.
The mains plug has to be pulled out!
1
Take off the switching knob 1.
For this purpose loosen the screw 2 in the knob.
Remove the cover 3 from the main switch.
For this purpose unlock the locking bar in drill-hole 4 with a
screwdriver.
Run the cable from the control box into the cable duct.
Insert the cable in the main switch.
Connect the cable cores of the control box to the
screws "T1" and "T2".
Connect the protective conductor of the control box in
the main switch.
Put the cover on the line switch again.
Put on the switching knob 1 and screw it tight.
Put on the cover of the cable duct.
4
3
2
7

Advertisement

Table of Contents
loading

Table of Contents