Connecting The Control Box To The Main Switch - Duerkopp Adler 531 Instruction Manual

Cnc automat for button sewing
Table of Contents

Advertisement

3.4 Connecting the control box to the main switch

2
5
CAUTION!
Any work on the electrical fittings of the button sewer must only be
done by qualified electricians or appropriately trained people.
It must be unplugged.
1
Remove the switch knob 1.
To do this undo the screw 2 on the knob.
Remove the cover 3 from the main switch.
To do this unlock the lock in the hole 4 with a screwdriver.
Put the cable from the control box into the cable channel.
Insert the cable into the main switch.
Connect the cable wires of the control box to screws T1 and T2.
Connect the control box protective earth to the main switch.
Put the cover on the power switch again.
Fit the switch knob and screw down,
Put the cable channel cover onto the cable channel.
4
3
2
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents