3.4 Connecting the control box to the main switch
2
5
CAUTION!
Any work on the electrical fittings of the button sewer must only be
done by qualified electricians or appropriately trained people.
It must be unplugged.
1
–
Remove the switch knob 1.
To do this undo the screw 2 on the knob.
–
Remove the cover 3 from the main switch.
To do this unlock the lock in the hole 4 with a screwdriver.
–
Put the cable from the control box into the cable channel.
–
Insert the cable into the main switch.
–
Connect the cable wires of the control box to screws T1 and T2.
–
Connect the control box protective earth to the main switch.
–
Put the cover on the power switch again.
–
Fit the switch knob and screw down,
–
Put the cable channel cover onto the cable channel.
4
3
2
7