3.4 Connecting the control box to the main switch

2
5
8
ATTENTION !
Work of every kind on the electric equipment of the sewing unit must
only be carried out by electricians or correspondingly trained
personnel.
The mains plug has to be pulled out!
1
Take off the switching knob 1.
For this purpose loosen the screw 2 in the knob.
Remove the cover 3 from the main switch.
For this purpose unlock the locking bar in drill-hole 4 with a
screwdriver.
Run the cable from the control box into the cable duct.
Insert the cable in the main switch.
Connect the cable wires of the control box to the screws "T1" and
T2".
Connect the protective conductor of the control box in the main
switch.
Put the cover on the mains switch again.
Put on the switching knob 1 and screw it tight.
Put the cover on the cable duct.
4
3