Duerkopp Adler 550-16-26 Operating Instructions Manual
Duerkopp Adler 550-16-26 Operating Instructions Manual

Duerkopp Adler 550-16-26 Operating Instructions Manual

Hide thumbs Also See for 550-16-26:

Advertisement

Postfach 17 03 51, D-33703 Bielefeld • Potsdamer Straße 190, D-33719 Bielefeld
Telefon +49 (0) 521 / 9 25-00
Ausgabe / Edition:
Änderungsindex
06/2010
Rev. index: 01.0
Engineered sewing station
Instructions for programming
Telefax +49 (0) 521 / 9 25 24 35 • www.duerkopp-adler.com
Printed in Federal Republic of Germany
550-16-26
for setting sleeves

Operating Instructions

Installation Instructions

Service Instructions

1
2
3
4
Teile-Nr./Part.-No.:
0791 550065

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 550-16-26 and is the answer not in the manual?

Questions and answers

Summary of Contents for Duerkopp Adler 550-16-26

  • Page 1: Operating Instructions

    550-16-26 Engineered sewing station for setting sleeves Operating Instructions Installation Instructions Service Instructions Instructions for programming Postfach 17 03 51, D-33703 Bielefeld • Potsdamer Straße 190, D-33719 Bielefeld Telefon +49 (0) 521 / 9 25-00 • Telefax +49 (0) 521 / 9 25 24 35 • www.duerkopp-adler.com Ausgabe / Edition: Änderungsindex Teile-Nr./Part.-No.:...
  • Page 2 All rights reserved. Property of Dürkopp Adler AG and copyrighted. Reproduction or publication of the content in any manner, even in extracts, without prior written permission of Dürkopp Adler AG, is prohibited. Dürkopp Adler AG - 2010 Copyright ©...
  • Page 3 Foreword This instruction manual is intended to help the user to become familiar with the machine and take advantage of its application possibilities in accordance with the recommendations. The instruction manual contains important information on how to operate the machine securely, properly and economically. Observation of the instructions eliminates danger, reduces costs for repair and down-times, and increases the reliability and life of the machine.
  • Page 4: General Safety Instructions

    General safety instructions The non-observance of the following safety instructions can cause bodily injuries or damages to the machine. 1. The machine must only be commissioned in full knowledge of the instruction book and operated by persons with appropriate training. 2.
  • Page 5: Table Of Contents

    Contents Page: Part 2: Installation Instructions class 550-16-26 – Original Instructions Scope of Delivery ..........General and Transportation Safety .
  • Page 7: Scope Of Delivery

    1. Scope of Delivery The scope of delivery depends on your order. Before proceeding to the installation, check whether all the necessary parts are available. Equipment (as per subclass): – 1 Machine head – 2 Sewing light – 3 Table top –...
  • Page 8: Setting The Working Level

    3 Setting the Working Level – The working level can be set between 750 and 900 mm (Measured up to the table top). – Loosen the screws 1 on the sleepers of the stand. – Set the table top so that it is at the desired level and in horizontal position.
  • Page 9: Electrical Connection

    4. Electrical Connection ATTENTION ! Any work on the electrical equipment of the sewing unit should be carried out exclusively by the properly qualified electricians or by properly qualified staff!. The mains plug must be pulled out. It is absolutely necessary to respect the enclosed manufacturer’s instructions for the step motor.
  • Page 10: Pneumatic Connection

    5. Pneumatic Connection ATTENTION ! A perfect function of the pneumatic elements will only be ensured if the line pressure ranges between 8 and 10 bar. The service pressure of the special sewing machine amounts to 6 bar. Pneumatic connection kit Under the reference number 0797 003031 it is possible to obtain a pneumatic connection kit for stands with conditioning unit for compressed air.
  • Page 11: Lubrication

    6. Lubrication Caution Risk of Injury! Oil can cause skin rashes. Avoid longer skin contact. After contact wash yourself thoroughly. ATTENTION ! The handling and disposal of mineral oils is subject to legal regulations . Deliver used oil to an authorized reception point. Protect your environment.
  • Page 12: Sewing Test

    7. Sewing Test Following the installation work, carry out a sewing test. – Insert the mains plug. Caution Risk of Injury! Switch off the main switch. Switch off the sewing machine before threading the needle and the hook thread. – Thread the reel thread (See Operating Instructions).

Table of Contents