Power-On Self Test; Checking Post Results - HP StorageWorks 2/16 - SAN Switch Installation Manual

Hp storageworks san switch 2/16 v3.1.2 (aa-rr84d-te, may 2004)
Hide thumbs Also See for StorageWorks 2/16 - SAN Switch:
Table of Contents

Advertisement

Installing the SAN Switch 2/16

Power-On Self Test

Each time the switch is powered on, rebooted, or reset, the switch automatically
runs a Power-On Self Test (POST). During POST the port status LEDs flash,
verifying that the switch is operating properly. POST completes in approximately
six minutes, with total boot time approximately seven minutes.
POST runs through the following test cycles:
For example, if the switch prompt does not display when POST completes, POST
was unsuccessful. Contact your authorized HP switch supplier for more
information.
To determine whether POST completed without errors, verify that all LEDs return
to a normal state after POST is complete. If one or more LEDs do not return to a
normal state, (and this is not due to the switch being set to beacon), see
"Interpreting LED
Note:
OS Version 3.1.x/4.1x Procedures User Guide

Checking POST Results

Check the success/fail results of the diagnostic tests run during POST via LED
activity, the error log, or Command Line Interface (CLI) using the errShow
command. For more information about error messages, refer to the
HP StorageWorks Fabric OS Version 3.1.x/4.1.x Reference Guide.
38
Preliminary POST diagnostics
Initialization of operating system
Initialization of hardware
Diagnostic tests on circuitry, port functionality, memory, parity, statistics
counters, and serialization
Activity" on page 54 in Chapter 3.
For more information about beaconing, refer to the
HP StorageWorks Fabric
.
SAN Switch 2/16 Version 3.1.2 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents