TRANSPORT
Packaging
The machine is shipped in a unique carton box which uses expanded polystyrene paddings.
The machine box is provided with conventional symbols that can be perfectly visible during the handling and
storage tasks.
The machine box must stay in a vertical position during the transport. Do not tip or try to place the box
tilted sideways in any way.
During transportation the box must be protected from hits, impacts, shocks and exposure of bad weather
elements.
Delivery inspection
After the delivery, check that the machine is in the exact condition described in the documentation of the
transport, accessories inclPCSed.
Check that the machine does not have any damage caused by transportation. If this happens, inform to the
shipper and the distributor of the machine.
The packaging materials are potentially dangerous and should be kept away from children.
Make sure to leave the materials of the box and packaging at a suitable recycling center.
INSTALLATION AND START UP
Positioning
MIN. 10cm
Note:
i
Leave an air gap of approximately 30 cm above the machine and 10 cm behind it to ensure
ventilation.
Install the machine on a level surface. Adjust the feet to
MIN. 30cm
ensure that it dispenses coffee evenly in all of the cups.
Select a level, dry, strong and stable installation surface at
least 110 cm off the oor.
Leave enough space above and behind the machine to
ensure easy cleaning and maintenance.
Do not install the machine whilst wet or damp. If wet or
damp, leave the machine until completely dry then ask
service personnel to check that none of the electrical
components are affected.
ZIRCON
17
R
Need help?
Do you have a question about the ZIRCON MINI 1GR CONTROL and is the answer not in the manual?
Questions and answers