Section 2 Setup And Operation; Unpacking The System; Hardware Setup; Connecting The Ac Adapter - NEC VERSA 6220 Service Manual

Hide thumbs Also See for VERSA 6220:
Table of Contents

Advertisement

Section 2
Setup and Operation
This section provides setup and operation information for the NEC Versa Series system (in-
cluding cabling, power-on verification and using the Setup utility, from this point on re-
ferred to as "Setup" only).

UNPACKING THE SYSTEM

Find an area away from devices that generate strong magnetic fields (electric motors,
transformers, etc.). Place the shipping carton on a sturdy surface and carefully unpack the
system. The carton contents include the system, CD-ROM reader, AC adapter, AC power
cord, battery, software CDs, and user documentation.

HARDWARE SETUP

When connecting power and signal cables, do the following. Note that the Power switch
turns on or off. Slide the switch right to turn it on, slide the switch again to turn it off.
NOTE
Always plug the AC adapter cord into an
easily accessible outlet.
Connect the AC adapter cable to the power port on right side of the NEC Versa.
1.
Figure 2-1 Connecting the AC Adapter

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VERSA 6220 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Versa 6260Versa 6230

Table of Contents