Download Print this page

Checking After Installation - Ruijie Reyee RG-NBS3100-24GT4SFP-V2 Installation Manual

Hide thumbs Also See for Reyee RG-NBS3100-24GT4SFP-V2:

Advertisement

Installation Guide
3.7

Checking After Installation

Caution
Before checking the installation, switch off the power supply so as to avoid any personal injury or damage to the
component due to connection errors.
Check that the ground line is connected.
Check that the cables and power input cables are correctly connected.
Check that all interface cables are laid out inside the equipment room. In the case of external cabling, check
that the lightning resistance socket or network interface lightning protector is connected.
Check that sufficient airflow is available around the device (over 10 cm).
17
Product Installation

Advertisement

loading
Need help?

Need help?

Do you have a question about the Reyee RG-NBS3100-24GT4SFP-V2 and is the answer not in the manual?

Questions and answers