Verify The Switch Passes Self Test - HP J4850A Installation And Getting Started Manual

Procurve series 5300xl switches
Hide thumbs Also See for J4850A:
Table of Contents

Advertisement

Installing the Switch 5300xl Series
Installation Procedures

4. Verify the Switch Passes Self Test

After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
it is working properly by plugging it into a power source and verifying it passes
its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify it works correctly also.
1.
Figure 2-5. Connecting the power cord
N o t e
The Switch 5300xl Series does not have a power switch. They are powered on
when the power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, please see the "Installation Precautions" on
2.
2-12
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
connect power cord to
power connector
Check the LEDs on the switch and on each of the switch modules. The
LED behavior is described on the next page.
If the LED display is different than what is described, especially if the
Fault LED stays on for more than approximately 120 seconds or it starts
flashing, the self test has not completed correctly. Refer to chapter 4,
"Troubleshooting" for diagnostic help.
page
2-5.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents