Verify The Switch Passes Self Test - HP Procurve Series 4100GL Installation And Getting Started Manual

Hide thumbs Also See for Procurve Series 4100GL:
Table of Contents

Advertisement

4. Verify the Switch Passes Self Test

After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
that it is working properly by plugging it into a power source and verifying
that it passes its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify that it works correctly too.
1.
N o t e
The Series 4100GL Switches do not have a power switch. They are powered
on when the power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, please see the Installation Precautions on page 2-3.
2.
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Connect power cord to
power connector
Check the LEDs on the switch and on each of the switch modules. The
LED behavior is described on the next page.
If the LED display is different than what is described, especially if the
Fault LED stays on for more than approximately 120 seconds or it starts
flashing, the self test has not completed correctly. Refer to chapter 4,
"Troubleshooting" for diagnostic help.
Installing the Series 4100GL Switches
Installation Procedures
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 4108gl bundleProcurve 4104glProcurve 4148gl

Table of Contents