Cisco 7603 - Modular Expansion Base Installation Manual page 89

Router module
Hide thumbs Also See for 7603 - Modular Expansion Base:
Table of Contents

Advertisement

Chapter 3
Installing Modules
Figure 3-8
Clearing the EMI Gasket
Figure 3-9
Ejector Lever Closure
Vertical slots
a.
OL-5077-7
Press down
WS-X6 K-SUP 2-2GE
CONSOL E
PORT
MODE
CONSOL E
SUPER VISOR 2
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
4
5
6
WS-X6 K-SUP 2-2GE
CONSOL E
PORT
MODE
CONSOL E
SUPER VISOR 2
PCMCIA
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
Ejector levers flush
with module faceplate
Position the supervisor engine or module in the slot. Make sure that you align the sides of the module
carrier with the slot guides on the top and bottom of the slot. (See
Switch
Load
100%
PORT 1
PCMCIA
EJECT
1%
1mm
Gap between the module
EMI gasket and the
module above it.
Switch
Load
100%
PORT 1
PORT 2
EJECT
1%
Installing a Supervisor Engine or a Module
Press down
PORT 2
Figure
3-10.)
Book Title
3-11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 7603 - Modular Expansion Base and is the answer not in the manual?

Questions and answers

Table of Contents