Using Screens from Other Projects
2. Select the screen to be copied on the source CX-Designer and drag-and-
drop the screen to the destination category. The dialog box for setting the
destination screen number and host will be opened.
Select the screen and
drag-and-drop to the
destination.
3. Specify the destination screen number and the address host in the dialog
box. The screen will be copied.
The screen will be copied.
4. The addresses used in the source screen will be automatically copied to
the symbol table in the destination project. The common settings accessed
by screens are also added automatically.
Section 4-2
51
Need help?
Do you have a question about the CX-DESIGNER V2.1 - 07-2007 and is the answer not in the manual?