2-1
Orientation to Option Board Features
2-1-1
Unpacking and Inspection
Option Board with
Grounding Cable
Option Board Mounting and Installation
Take a few moments to unpack your new 3G3AX-MX2-PRT-E Option Board
and perform these steps:
1. Look for any damage that may have occurred during transportation.
2. Verify the contents of the box:
Instruction Sheet
3. Inspect the markings on the Option Board. Make sure it matches the prod-
uct part number you ordered.
SECTION 2
Warning Labels
5