8.4.2 Hour-related parts
Art. #
001538.72.00
SHUTTLE RACE COVER CPL.
007903.50.02
BELT STD-554-S2M-6
030214.70.00
BELT STRETCHER PREASSEMBLED.
007884.72.01
DRIVER MOTOR CPL
030206.53.00
CB-HOOK
031159.50.00
HOOK-GUIDEWAY FINISHED
030333.71.00
HOOK DRIVER PREASS.
030449.70.01
HOOK DRIVE CRANK CPL.
8.5 Maintenance Checklist
The Maintenance checklist explains what work is to be carried out.
Note:
The Maintenance checklist refers to maintenance work only (cleaning, lubrication, visual and functional
checks) and not to repairs (excluded owing to their complexity).
The parts whose replacement is recommended after the display of the sixth Maintenance interval are listed
in the wear-and-tear-parts definition.
The Service and Maintenance Manual and the service and technical information notices serve as a basis for
the service work to be carried out.
The service work listed in the maintenance check list must be carried out in the order listed, at each service
interval.
8.5.1 Measures to be taken before the Maintenance
Attention!
The machine must be switched on in order to use the Service Program. Refer to the safety instructions
please.
Read out the stitch and hour counter and enter in the Service Report.
8.5.2 Measures to be taken after the service
Recommended:
Create a Service Report and save in a customer database, or file a copy. Furthermore, the following data
should be noted in the Service Report.
Customer and machine data, standard accessories (supplied with the machine), stitch and hour counter,
report number, Maintenance interval, complaint, work carried out, time and material input, date when next
Maintenance is due, name of technician.
BERNINA International AG · Seestrasse 161 · CH-8266 Steckborn · Switzerland
B330 / B350 (PE) / B380
Article
Maintenance
Remarks
interval
6 / 12
6 / 12
Drive motor
6 / 12
12
12
12
12
12
62