6.4 Equipotential bonding and mounting base profile on bases (option)
Earthing / equipotential bonding the base profiles
1. Place the grounding spring in the slots of the high base before the base profile is clicked into the high base.
The use of 1 grounding spring creates a connection area of 3mm
base) create a connection area of 6mm
durable connection.
2. Put the high base (inc. roof support) upright and slide the end of the base profile into the opening of the high base until it
clicks into place. NOTE! The high base element for Portrait is asymmetrical, see the drawing below.
3. Place the grounding spring in the slots of the low base before the base profile is clicked into the low base.
4. Slide the low base (inc. roof support) onto the other end of the base profile until it clicks into place.
5. The first FlatFix Fusion segment is ready. Repeat the above steps until you have enough FlatFix Fusion segments to
install the first two rows of solar panels.
1.
NOTE!
The high base
element for Portrait is
asymmetrical.
5.
Rev. 08.08.23
. The teeth on the grounding spring bite into the base profiles and create a solid and
2
2.
MANUAL FOR FLATFIX FUSION MOUNTING SYSTEM FOR FLAT ROOFS
. Two grounding springs (one spring on each side of the
2
CLICK!
4.
CLICK!
3.