Placement Of Spray Nozzle Assembly; Installation Of Plumbing - Harvest TEC 735Z Installation Manual

55 gallon automatic preservative applicator
Table of Contents

Advertisement

Placement of Spray Nozzle Assembly

The cross bar on the wind guard above the pick-up head provides a mounting point for the nozzle holders
(001-4714). Mount the nozzle holders on the wind guard, using the supplied U bolts (001-4714UBL).
Measuring from the center of the baler, the nozzle holders will need to be 6" (15cm) apart on a 4' (1.2M) and 9"
(23cm) apart on a 5' (1.5M) Do not fully tighten.
Position the nozzle holders so that the tips spray in a horizontal direction over the top of the baler's pickup. The
tips should be located so that they will be between 14" and 18" (35 - 45 cm) from the normal path of hay. Make
sure the nozzle holders do not interfere with the tying system. *It is recommended to test the system with water
prior to field operation. This will ensure the fan pattern from the tips reaches the outside edges of the pickup
while having a slight overlap in the center.

Installation of Plumbing

A. Intake
Locate parts bag 16. Use the 003-EL3412 on the bottom of the tank to route 1/2" line (002-9001) to the
003-A1212 or 003-EL1212 fitting used on the ball valve attached to the pump plate. Attach hose clamps
(003-9003) on both of the fittings.
B. Discharge
Route the 1/2" hose from the pump output toward the front of the baler and connect to the solenoid
assembly (SOL-3SP-A). Secure the solenoid assembly and hose along baler, positioning the solenoid as
close to the spray tips as possible while remaining in an accessible location. Connect the 1/4" hose to the
outgoing side of the solenoid to tip assembly.
C. Low, Standard and High Output Tips
Your baler comes standard with one set of tips.
Optional High Output Tip kit 700RBHTK is available for increased application rates.
7

Advertisement

Table of Contents
loading

Table of Contents