Installation
CAUTION:
PLEASE REVIEW THE RISKS/HAZARDS SAFETY
MESSAGES IN THE FRONT MATTER OF THIS
MANUAL BEFORE INSTALLING, COMMISSIONING,
OR OPERATING THIS INSTRUMENT.
Installation of the Model 3000RS-P Analyzer includes:
1. Unpacking
2. Mounting
3. Gas connections
4. Electrical connections
5. Installing the Micro-Fuel Cell
6. Testing the system.

3.1 Unpacking the Analyzer

Although the analyzer is shipped complete, certain parts, such as
fuses and sensors, are wrapped separately to be installed on site as part
of the installation. Carefully unpack the analyzer and inspect it for
damage. Immediately report any damage or shortages to the shipping
agent.

3.2 Mounting the Analyzer

The Model 3000RS-P is for indoor use in a general-purpose area. It
is NOT for hazardous environments of any type.
The RS series analyzers are designed to mount in a 3U size 19"
relay chassis. A standard RS analyzer is supplied without chassis or
cover. The optional 19" chassis can be supplied configured for one to
four RS analyzers. There is also a single cover option that includes the
cover and feet for bench top use of a single RS analyzer.
The touch screen operator control buttons are mounted on the front
panel, which is hinged at the bottom and provides access to the sensor
Teledyne Analytical Instruments
Installation
19