12.1

HOSE CONNECTIONS

The connection of the sample gas input, depending on the connection type, is directly on the heat exchanger or
on the clamping plate.
Note
The condensate connections are made directly to the hose pump.
All hose connections are standard DN 4/6 mm ferrule hose fittings made of PVDF, for gas inlet temperatures up to
105° C [221 °F] (see chapter 8).
Installation of the sample gas hoses or the condensate hose must be carried out as follows:
1. Loosen the clamping ring screwed fitting counterclockwise; It is important to ensure that the nut is carefully
removed from the threaded joint, so that the loose clamping ring which is in the nut is not lost;
2. Slide the nut over the hose connection;
3. Slide the clamping ring with the thicker bulge facing the nut, onto the connection hose;
4. Attach the hose to the nipple in the threaded support;
Note
5. Hand-tighten the nut.
The hose is now mounted slip-proof and pressure-tight.
The dismantling of the hoses is carried out in the reverse order.
Warning
18
Do not confuse the hose connections. They are marked appropriately.
After connecting all the lines, they should be checked to ensure there are no leaks.
The tightness of the connection can only be guaranteed if the hose has a straight end
edge (using a hose cutter).
Aggressive condensate is possible.
Chemical burns caused by aggressive media possible!
Wear protective gloves and protective glasses!
Wear proper protective clothing!