Installation; Control Cabinet Installation - Pilz PNOZ m B0.1 Operating Manual

Table of Contents

Advertisement

Installation

6
Installation
6.1

Control cabinet installation

}
The unit should be installed in a control cabinet with a protection type of at least IP54.
}
Install the system vertically on to a horizontal mounting rail. The venting slots must face
upward and downward. Other mounting positions could damage the safety system.
}
Use the locking elements on the rear of the unit to attach it to a mounting rail.
}
In environments exposed to heavy vibration, the unit should be secured using a fixing ele-
ment (e.g. retaining bracket or end angle).
}
Open the locking slide before lifting the unit from the mounting rail.
}
To comply with EMC requirements, the mounting rail must have a low impedance con-
nection to the control cabinet housing.
Operating Manual PNOZ m B0.1
1005720-EN-04
NOTICE
Damage due to electrostatic discharge!
Electrostatic discharge can damage components. Ensure against discharge
before touching the product, e.g. by touching an earthed, conductive sur-
face or by wearing an earthed armband.
| 16

Advertisement

Table of Contents
loading

Table of Contents