❷ Installing The Salt Water Chlorinator; I Installing The Cell - Zodiac eXO iQ Series Instructions For Installation And Use Manual

Salt water chlorinator, ph/redox regulation
Hide thumbs Also See for eXO iQ Series:
Table of Contents

Advertisement

2.1 I Installing the cell

• The cell must be installed on the piping aft er the fi ltrati on system, aft er any measurement sensors, and
aft er any heati ng system.
Installing the chlorinator only
(Example with eXO® (iQ))
• The cell must always be the last element placed on the pool return pipe (see diagram).
• It is always recommended to install the cell on a by-pass. This assembly is MANDATORY if the
fl ow is in excess of 18 m³/hour to avoid head loss.
• If you installed the cell on a by-pass, it is recommended to fi t a check valve downstream from
the cell instead of a manual valve, to avoid any risk of incorrect confi gurati on which could
result in poor circulati on inside the cell.
2.1.1 eXO® (iQ) cell
• Make sure that the cell is placed HORIZONTALLY. The water should fl ow from the electric connecti ons
towards the opposite side.
• Use the screw-on fi tti ngs to fi x the cell to the pipes.
• For Ø63 mm pipes, glue them directly to the screw-on fi tti ngs. For Ø50 mm pipes, use glue-on PVC adapters
of the corresponding diameter (grey models; the white models are for 1 ½'' UK pipes).
• Connect the cell power cord following the wire colour codes (red, black and blue connectors) and then refi t
the protecti ve cap. The two red wires can be connected to one or the other red terminals on the electrode.
8
❷ Installing the salt water chlorinator
12.5 cm
21.5 cm
32 cm
Installing the chlorinator + opti onal module
(Example with eXO® (iQ))
11 cm
11 cm
15.5
21.5
cm
cm
21.5 cm

Advertisement