Verify Installation; Power Up - Honeywell Vertex M User Manual

Continuous gas monitor
Hide thumbs Also See for Vertex M:
Table of Contents

Advertisement

4.3 Verify Installation

Ahead of the startup sequence, make sure that the following installation steps have been
completed:
Sample lines
l
Exhaust line
l
AC power connection
l
Relay wiring
l
See "Installation" on page  33 for connection details.

4.4 Power Up

Use the rack power switch behind the front door to power up the Vertex M system.
1. Open front door.
2. Turn on rack power switch.
3. Turn on power switch to appropriate analyzers.
4. Close and latch front door.
After 15 seconds, the analyzer status LEDs sequence four times through all colors.
Vertex M
48
User Manual

Advertisement

Table of Contents
loading

Table of Contents