CHAPTER
3

3.1 Introduction

The installation and initial start-up procedure for the Vertex M system consists of seven steps,
described in this and the following sections:

Surveying the Installation Site

l
Optional Floor Mounting
l
Installing Sample Lines/Filters
l
Installing Pump Exhaust Line
l
Electrical Power
l
Data Acquisition System
l
Wiring Optional Relays
l
3.2 Surveying the Installation Site
A survey of the site helps make important decisions before installing the Vertex M system.
Topics in this section assist with appropriate placement of the Vertex M system and in
determining if there are special filtering needs at the sampling location.
The site should:
Be remote from the monitored location, not sharing the atmosphere
l
Have sufficient ventilation for cabinet cooling
l
Have power available
l
Be indoors in an area that is not subject to wide variations in temperature and humidity.
l
Note: The specified humidity is 20–65% RH and a temperature between 59°F to 95°F (15°C to
35°C).
Vertex M
INSTALLATION
33
User Manual