Installation; Installation Step 1: Surveying The Installation Site - Honeywell Vertex VC 4 User Manual

4-points continuous monitor
Hide thumbs Also See for Vertex VC 4:
Table of Contents

Advertisement

CHAPTER
3

Installation

The installation procedure for the Vertex™ VC4 System consists of six steps:
1. Surveying the Installation Site
2. Optional Mounting Method
3. Installing Sample Lines / Filters
4. Installing Pump Exhaust Line
5. Electrical Power
6. Data Acquisition System

Installation Step 1: Surveying the Installation Site

A survey of the site helps you to make important decisions before installing your Vertex™ VC4 System. Topics in
this section are intended to assist you with appropriate placement of the Vertex™ VC4 System and in
determining if you have special filtering needs at the sampling location.
The site should:
Be remote from the monitored location
Have sufficient ventilation for cabinet cooling
Have power available
Be indoors in an area that is not subject to wide variations in temperature and humidity
Note: The recommended humidity is 20-80% RH and a temperature between 50°F to 104°F (10°C to 40°C).
Placement of the Vertex™ VC4 System
Install the Vertex™ VC4 System in an environmentally-protected site remote from the manufacturing or storage
locations that it monitors.
You can place the Vertex™ VC4 System away from sample locations with sample tubing up to 400ft. (122m)
length.
Exposure to Dust and Humidity
Exposure to corrosive gases or materials, excess moisture, dust and other unusual environmental conditions
could seriously hamper the unit's monitoring ability and could cause damage to it.
Allow room around the Vertex™ VC4 System for ventilation and servicing.
TM
Vertex
VC4 System
21
User Manual

Advertisement

Table of Contents
loading

Table of Contents