6.4 Replacing an Analyzer
The Vertex M rack is designed for quick replacement of major components. Both the
Chemcassette™ and pyrolyzer analyzers may be replaced while other analyzers continue to
monitor.
6.4.1 Disconnecting Cables
In steps 4 and 5 of the sequence that follows, the circular tubing harness and four electrical
cables from the back of the analyzer need to be disconnected. The user will need to reach
around to the back of the analyzer as shown in this photo. In disconnecting or reconnecting the
harness and cables, note the following:
6.4.2 Remove Analyzer
1. Set analyzer to idle in the Runtime Options window.
2. Touch Main Screen, Menu, Maintenance, and then Analyzer Operation.
3. Select the analyzer that will be replaced.
4. Touch Release Analyzer.
5. Open the front door and turn off power for the analyzer (and pyrolyzer switch if a Pyrolyzer
is being replaced).
6. Pull analyzer out of cabinet. Locks on the slides limit the analyzer travel.
Vertex M