TOOLING REMOVAL
Before installing or removing tooling the die head must be rotated to approximately the 90°
position. This is required to gain the clearance necessary to allow the die and hook arm to clear
the clamp block assembly.
Follow the preceding steps to move the die head:
1. Remove all of the drag links by loosening nuts at the end of the long drag link rod and
removing the socket head screw on the short drag link.
Figure 5 Drag Link Removal
2. Open the pressure die assembly using the supplied wrench.
Figure 6 Open Pressure Die Assembly
28
28