RG-NIS3100 Series Switches Hardware Installation and Reference Guide
3
Product Installation
Ensure that you have read chapter 2 carefully.
Verify that the requirements described in chapter 2 have been met.
3.1
Installation Flowchart
3.2
Confirmations Before Installation
Before installation, confirm the following points at the installation site:
Cooling requirements are met.
Temperature and humidity requirements are met.
The power supply and required current are available.
Network cables have been deployed.
3.3
Installing the RG-NIS3100
Precautions
During installation, note the following points:
During installation, pay attention to the following points:
Install the switch in place correctly
Ground the switch
Connect the power
module
Connect external interface cables
Bundle the cables
Verify installation
End
31
Product Installation