Connection Process - Ingeteam INGECON SUN 3Play 160TL Installation And Operation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 67
Ingeteam

7.3.2. Connection process

1.
Connect the communications card to the inverter.
2.
Guide the RS-485 wiring and insert the connector in place, ensuring the wiring is not tight and has a
certain amount of slack. Use the ferrite supplied and a flange to secure it.
3.
Tighten the packing gland to ensure it is sealed.
94
Connection of accessories
ABZ2011IQM01_H - Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents