Dc Connection Process; Std Version - Ingeteam INGECON SUN 3Play 160TL Installation And Operation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 67
DC connection

9.3. DC connection process

9.3.1. STD Version

With the switch OFF and the AC cables without voltage, open the unit's lower compartment.
1.
Uninstall the polycarbonate guard.
2.
Follow the steps below according to the cable diameter.
Option 1. Cable diameter 12 ~ 20 mm: cables pass through M40 packing gland
a.
Ensure that the spade terminal dimensions allow it to pass through the M40 packing gland.
b.
Fit the spade terminal on the cable.
c.
Loosen the head of the M40 packing gland and remove the cap.
d.
Pass the power cables through the M40 packing gland, using the diameter reducer provided.
e.
Place each terminal in its terminal block, respecting the polarity, and tighten the packing gland head to
ensure the sealing.
Option 2. Cable diameter 20 ~ 28 mm: cables pass through M40 cable grommet membrane
a.
Remove the M40 packing gland.
b.
Install the cable grommet membrane in the hole.
c.
Fit the spade terminal on the cable.
d.
Pass the cables through the M40 membrane (a soapy solution can be used).
e.
Place each terminal in its terminal block respecting the polarity.
Option 3. Cable diameter 28 ~ 35 mm: cables pass through M50 cable grommet membrane
a.
Remove the M50 caps.
b.
Install the cable grommet membrane in the hole.
c.
Fit the spade terminal on the cable.
d.
Pass the cables through the M50 membrane (a soapy solution can be used).
ABZ2011IQM01_H - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
105

Advertisement

Table of Contents
loading

Table of Contents