Connecting To The Electricity Grid - Ingeteam INGECON SUN 3Play 160TL Installation And Operation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 67
Ingeteam
First connection to the electric grid

10.3. Connecting to the electricity grid

Once the unit has been configured, close the external AC thermomagnetic circuit breaker in order to supply AC
voltage to the unit. In the case of the Q at Night unit, the thermomagnetic circuit breaker had to be closed in
"10.2. Initial connection and
configuration".
From this moment the unit is ready to be connected to the electricity grid. If the unit does not connect, verify if
there are any alarms or manual stops.
110
ABZ2011IQM01_H - Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents