JLG H340AJ Service And Maintenance Manual page 129

Hide thumbs Also See for H340AJ:
Table of Contents

Advertisement

SECTION 4 - BOOM & PLATFORM
5. Align the telescope cylinder rod end with the corre-
sponding hole in the fly boom section. If necessary,
attach a portable power supply to the cylinder to extend
or retract the cylinder for alignment. Install the retaining
pin and secure it in place with the retaining ring.
4-12
6. Using JLG P/N 0100011 thread locking compound or
equivalent, secure the rear of the telescope cylinder to
the base boom section with the attaching bolts and
washers. Torque the bolts 95 ft.lbs. (129 Nm).
3121634

Advertisement

Table of Contents
loading

Table of Contents