JLG H340AJ Service And Maintenance Manual page 136

Hide thumbs Also See for H340AJ:
Table of Contents

Advertisement

REPOSITION CABLES/HOSES AND KEEP COVERED DURING GRINDING TO PRE-
VENT DAMAGE.
3. To remove a link, rivets holding links together must be
removed. Use a right-angle pneumatic die grinder with
a 1/4 in. ball double cut bur attachment.
4. insert tool into rolled over end of rivet. Grind out middle
of rivet until rolled over part of rivet falls off. Repeat for
all rivets to be removed.
5. After grinding it may be necessary to use a center punch
with a hammer to remove rivet.
3121634
SECTION 4 - BOOM & PLATFORM
NOTE: It may be necessary to loosen fixed end brackets from
machine to move track section enough to disconnect links.
4-19

Advertisement

Table of Contents
loading

Table of Contents