Operation; Observing Warm-Up Time; Manually Opening And Closing The Draft Shield; Opening And Closing The Motorized Draft Shield - Sartorius Cubis MCE Series Operating Instructions Manual

High-capacity micro balance
Hide thumbs Also See for Cubis MCE Series:
Table of Contents

Advertisement

Operation

54
Operating Instructions Cubis
8
Operation
8.1

Observing Warm-up Time

After connecting to the power supply, the warm-up time must be observed.
This enables the device to reach its required operating temperature and
ensures accurate values during weighing processes.
If this relates to a conformity-assessed device: The weight value is marked as
invalid during the warm-up period.
Procedure
Please ensure that the warm-up time is observed (see
t
Chapter "15.6 Wait Times", page 80).
8.2
Manually Opening and Closing the
Draft Shield
All doors can be fully or partially opened.
Procedure
To open the manual draft shield, e.g. the right-hand door: Take the
t
corresponding door handle and push backwards.
To close the manual draft shield, e.g. the right-hand door: Take the
t
corresponding door handle and push it fully forwards.
8.3
Opening and Closing the Motorized
Draft Shield
8.3.1

Opening or Closing on the Operating Display

Requirements
The motorized opening and closing of the draft shield is configured (see
Chapter 7.6, page 53).
Procedure
Press the [Change] key. This enables the motorized draft shield to be
t
opened or closed motorically according to the stored setting.
| MCE Models
®

Advertisement

Table of Contents
loading

Table of Contents