JLG 400SC Service And Maintenance Manual page 56

Hide thumbs Also See for 400SC:
Table of Contents

Advertisement

SECTION 3 - CHASSIS & TURNTABLE
11. Attach a board or other long, rigid object to top of tread
as shown below and lift into position along frame.
Figure 3-9. Preparation for Installation
12. Position rubber tracks around drive sprocket. Core metal
of the rubber track must be in sprocket grooves.
Figure 3-10. Install on Drive Sprocket
13. Place a spacer close to the upper roller and bring the
rubber track close to idler.
Figure 3-11. Aligning Track on Frame
3-4
14. Use a crowbar to complete installing over idler. Idler
must engage correctly with rubber track.
Figure 3-12. Install Track on Idler
15. Adjust track tension. Refer to "Track Tension" on page 3-
2.
16. Re-check track tension after first 10 hours of operation.
31215019

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sjc

Table of Contents