JLG 400SC Service And Maintenance Manual page 46

Hide thumbs Also See for 400SC:
Table of Contents

Advertisement

SECTION 2 - GENERAL
NOTE: Reference the Operation and Safety Manual for completion procedures for the Pre-Start Inspection.
Boom Assembly
Boom Weldments
Hose/Cable Carrier Installations
Pivot Pins and Pin Retainers
Sheaves, Sheave Pins
Bearings
Wear Pads
Covers or Shields
Platform Assembly
Railing
Gate
Floor
Rotator
Lanyard Anchorage Point
Turntable Assembly
Swing Bearing or Worm Gear
Oil Coupling
Swing Drive System
Turntable Lock
Hood, Hood Props, Hood Latches
Chassis Assembly
Spindle Thrust Bearing/Washers
Drive Hubs
Functions/Controls
Platform Controls return to neutral/off when released
Ground Controls return to neutral/off when released
Function Control Locks, Guards, or Detents
Footswitch (shuts off function when released)
Emergency Stop Switches (Ground & Platform) arrest all platform movement
Function Limit or Cutout Switch Systems
Capacity Indicator
Swing Brakes
Auxiliary Power
2-6
Table 2-3. Inspection and Preventive Maintenance Schedule
AREA
Inspections
1
2
Pre-Delivery
or Frequent
(Quarterly)
Inspection
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
2
1, 2, 3
2
1, 2, 3, 4
1, 2, 6
50
1
, 2
4
1, 4
1, 2, 3
3
1, 2
1, 4
1, 3, 6, 9
1, 3, 6, 9
1, 3, 9
1, 3, 9
1, 3, 6
1, 3, 9
1, 3, 9
1, 3, 9
1, 3, 9
3
Annual
(Yearly)
Inspection
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
2
1, 2, 3
2
1, 2, 3, 4
1, 2, 6
50
1
, 2
4
1, 4
1, 2, 3
3
1, 2
1, 4
1, 3, 6, 9
1, 3, 6, 9
1, 3, 9
1, 3, 9
1, 3, 6
1, 3, 9
1, 3, 9
1, 3, 9
1, 3, 9
31215019

Advertisement

Table of Contents
loading

This manual is also suitable for:

460sjc

Table of Contents